Fiscal Year 2022-23 Pavement Management Program Implementation Project

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

Project Location

FY 2022-23 PMP Implementation map

Scope of Work

  • Surface grinding and placement of Asphalt Rubber Hot Mix pavement (ARHM) over asphalt leveling course (Overlay/Resurfacing)
  • Surface grinding and placement of Asphalt Rubber Hot Mix pavement (ARHM) over Asphalt Rubber Aggregate Membrane (ARAM system III)
  • Installation of emulsion aggregate slurry (Slurry Seal Type II) over Asphalt Rubber Aggregate Membrane (ARAM System I)
  • Selective removal and reconstruction of damaged asphalt concrete pavement
  • Selective removal and repair of broken and damaged sidewalks, curbs, curbs and gutters, cross gutters, driveway approaches, local depressions, alley aprons and bus pads
  • Installation of new curb ramps meeting current Federal ADA requirements
  • Sanitary sewer point repairs and lining
  • Planting of new trees and pruning of tree roots
  • Adjustment of existing utilities to finished grade
  • Removal and replacement of existing traffic striping and installation of new striping

Phase

  • The project is currently in the design phase

Construction Schedule

  • Construction is tentatively scheduled from Summer 2025 – Spring 2026 barring any unforeseen circumstances

Construction Photos

FY 23 PMP

Contact Information

  • Public Works Engineering: (818) 548-3945
  • Public Works Project Manager: Viktoriya Pakhanyan, Email