Fiscal Year 2023-2024 Pavement Management Program Implementation Project

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

Scope of Work

  • Selective removal/reconstruction/surface grinding of deteriorated pavement and placement of asphalt concrete pavement
  • Placement of asphalt rubber hot mix pavement (ARHM) over asphalt leveling course
  • Application of crack sealing material and emulsion aggregate slurry (Slurry Seal Type II)
  • Selective removal and repair of broken and damaged sidewalks, curbs, curbs and gutters, cross gutters, driveway approaches, local depressions, alley aprons and bus pads
  • Installation of new curb ramps meeting current Federal ADA requirements
  • Removal and planting of new trees and pruning of tree roots
  • Adjustment of existing manholes and water meters to finished grade
  • Removal and replacement of existing traffic striping and installation of new striping.

Current Phase

  • Design

Project Location

FY 2023-24 PMP map 1jpg

 FY 2023-24 PMP map 2jpg

 Construction Updates

  •  Construction is tentatively scheduled from Summer 2025 – Spring 2026 barring any unforeseen circumstances.

Construction Schedule 

  • Check back at the start of the project

Traffic Impacts

  • Check back at the start of the project

Construction Photos 

jpgFY2024 Pavement Management Program Implementation

Contact Information

  • Public Works Engineering, (818) 548-3945
  • Public Works Project Manager: Huang Zheng, hzheng@glendaleca.gov