Home MenuFiscal Year 2023-2024 Pavement Management Program Implementation Project
Scope of Work
- Selective removal/reconstruction/surface grinding of deteriorated pavement and placement of asphalt concrete pavement
- Placement of asphalt rubber hot mix pavement (ARHM) over asphalt leveling course
- Application of crack sealing material and emulsion aggregate slurry (Slurry Seal Type II)
- Selective removal and repair of broken and damaged sidewalks, curbs, curbs and gutters, cross gutters, driveway approaches, local depressions, alley aprons and bus pads
- Installation of new curb ramps meeting current Federal ADA requirements
- Removal and planting of new trees and pruning of tree roots
- Adjustment of existing manholes and water meters to finished grade
- Removal and replacement of existing traffic striping and installation of new striping.
Current Phase
- Design
Project Location
Construction Updates
- Construction is tentatively scheduled from Summer 2025 – Spring 2026 barring any unforeseen circumstances.
Construction Schedule
- Check back at the start of the project
Traffic Impacts
- Check back at the start of the project
Construction Photos
Contact Information
- Public Works Engineering, (818) 548-3945
- Public Works Project Manager: Huang Zheng, hzheng@glendaleca.gov