Home MenuNorth Verdugo Road Multi-Modal Improvements Project
Project Location
- North Glendale Avenue between Monterey Road and North Verdugo Road
- North Verdugo Road between North Glendale Avenue and Honolulu Avenue
Scope of Work
- Removal/reconstruction/surface grinding of deteriorated pavement and placement of asphalt concrete pavement
- Placement of asphalt rubber hot mix pavement (ARHM) over asphalt leveling course
- Selective removal and repair of broken and damaged sidewalks, curbs, curbs and gutters, cross gutters, driveway approaches, local depressions, alley aprons and bus pads
- Installation or modification of curb ramps meeting the latest Americans with Disabilities Act (ADA) guidelines
- Planting trees in empty and new tree wells to provide continuous shading
- Adjusting utility frame and covers to finished roadway pavement grade
- Conducting storm drain and sanitary sewer infrastructure analysis and design
- Constructing new sidewalk on Verdugo Road within City’s right-of-way in coordination with property owners
- Improving loading and unloading zone in front of Verdugo Woodlands Elementary School
- Installing pedestrian scale lighting on both sides of Verdugo Road
- Improving existing pedestrian bridge adjacent to Glendale Community College, perform necessary bridge maintenances, install public art and wayfinding signage
- Adding curb extensions at the intersections of Verdugo Road at Arvin Drive and Mountain Street
- Installing new thermoplastic traffic striping, pavement markings and signage including bike lane improvements per latest City of Glendale Bicycle Master Plan requirements
- Intersection reconfiguration at Verdugo Road and Canada Boulevard, North and South intersection, to accommodate safe bicycle travels at the intersections
- Conduct a feasibility study and design for installation of crosswalk Rectangular Rapid Flashing Beacons (RRFB) and/or Pedestrian Hybrid Beacons (HAWK) along Verdugo Road
- Installing new bicycle facilities
- Modification of existing traffic signals at the following intersections:
- North Verdugo Road at Broadview Drive (Signal Modification)
- North Verdugo Road at La Crescenta Avenue (Signal Modification)
- North Verdugo Road at Menlo Drive (Signal Modification)
- North Verdugo Road at Towne Street (Signal Modification)
- North Verdugo Road at Canada Boulevard (Signal Modification)
- North Verdugo Road at Civic Auditorium (Signal Modification)
- North Verdugo Road at Mountain Street (Signal Modification)
- North Glendale Avenue and East Glenoaks Boulevard (Signal Modification)
- North Glendale Avenue and North Verdugo Road (Signal Modification)
Phase
The project is in pre-design phase.
Construction Schedule
Check back at the start of the project.
Traffic Impacts
Check back at the start of the project.
Construction Photos
Contact Information
- Public Works Engineering: (818) 548-3945
- Public Works Project Manager: Tatevik Barakazyan, Email