City of Glendale, CA
Home MenuSouth Central Avenue Project
Project Location
- S. Central Avenue – Colorado Street to Los Feliz Road
Scope of Work
- Removal/reconstruction/surface grinding of deteriorated pavement and placement of asphalt concrete pavement
- Placement of asphalt rubber hot mix pavement (ARHM) over asphalt leveling course
- Selective removal and repair of broken and damaged sidewalks, curbs, curbs and gutters, cross gutters, driveway approaches, local depressions, alley aprons and bus pads
- Installation or modification of curb ramps meeting the latest Americans with Disabilities Act (ADA) guidelines
- Planting trees in empty and new tree wells to provide continuous shading
- Adjusting utility frame and covers to finished roadway pavement grade
- Installing new traffic striping, pavement markings and signage including Sharrows and bike lane improvements per City of Glendale Bicycle Master Plan requirements
- Modification of existing traffic signals at the following intersections:
- S.Central Avenue and Colorado Street
- S. Central Avenue and W. Lomita Avenue
- S. Central Avenue and W. Windsor Road
- Conducting storm drain and sanitary sewer infrastructure analysis and design
Phase
The project is in pre-design phase.
Construction Schedule
Check back at the start of the project.
Traffic Impacts
Check back at the start of the project.
Construction Photos
Contact Information
- Public Works Engineering: (818) 548-3945
- Public Works Project Manager: Tatevik Barakazyan, Email