South Central Avenue Project

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

Project Location

 Picture1

  • S. Central Avenue – Colorado Street to Los Feliz Road

Scope of Work

  • Removal/reconstruction/surface grinding of deteriorated pavement and placement of asphalt concrete pavement
  • Placement of asphalt rubber hot mix pavement (ARHM) over asphalt leveling course
  • Selective removal and repair of broken and damaged sidewalks, curbs, curbs and gutters, cross gutters, driveway approaches, local depressions, alley aprons and bus pads
  • Installation or modification of curb ramps meeting the latest Americans with Disabilities Act (ADA) guidelines
  • Planting trees in empty and new tree wells to provide continuous shading
  • Adjusting utility frame and covers to finished roadway pavement grade
  • Installing new traffic striping, pavement markings and signage including Sharrows and bike lane improvements per City of Glendale Bicycle Master Plan requirements
  • Modification of existing traffic signals at the following intersections:
  • S.Central Avenue and Colorado Street
  • S. Central Avenue and W. Lomita Avenue
  • S. Central Avenue and W. Windsor Road
  • Conducting storm drain and sanitary sewer infrastructure analysis and design

Phase

The project is in pre-design phase.

Construction Schedule

Check back at the start of the project.

Traffic Impacts

Check back at the start of the project.

Construction Photos

S Central Rehab

Contact Information

  • Public Works Engineering: (818) 548-3945
  • Public Works Project Manager: Tatevik Barakazyan, Email