Maintenance District 6 Pavement Rehabilitation Project - Phase I

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

       Congratulations, the Maintenance District 6 Pavement Rehabilitation Phase I Project was awarded the 2023 Outstanding Operations and Maintenance Project by the by the American Association of Civil Engineers Metropolitan Los Angeles Branch (ASCE MLAB). 

      Click here for more info on the awards

      Project Description

      The scope of work for this project consists of the following:

      • Selective removal and disposal of asphalt and Portland cement concrete (P.C.C.) pavements;
      • Installation of Asphalt Rubber Hot Mix pavement (ARHM) over base course (Full depth reconstruction);
      • Surface grinding and placement of Asphalt Rubber Hot Mix pavement (ARHM) over asphalt leveling course (Overlay);
      • Header cutting the existing pavement, removing and hauling away of grindings and Placement of Asphalt Rubber Hot Mix pavement (ARHM) over Asphalt Rubber Aggregate Membrane (ARAM system III);
      • Installation of emulsion aggregate slurry (Slurry Seal Type II) over Asphalt Rubber Aggregate Membrane (ARAM System I);
      • Application of crack sealing material and emulsion aggregate slurry (Slurry Seal Type II);
      • Installation of Central Mix Rubberized Emulsion Aggregate Slurry (REAS, Type-II);
      • Installation of A.C. skin patch;
      • Construction of P.C.C. curbs, gutters, and/or integral curb and gutters;
      • Selective removal and repair of broken and damaged sidewalks, curbs, curbs and gutters, cross gutters, driveway approaches, local depressions and alley aprons;
      • Installation of new curb ramps meeting current American with Disabilities Act guidelines;
      • Sanitary sewer point repairs and lining;
      • Planting of new trees and pruning of tree roots;
      • Adjustment of existing utilities covers and frames to new finished grade; and,
      • Removal and replacement of traffic striping, pavement markings; and Sharrows.

      Phase

      • The project construction is complete.

      Construction Schedule

      Project Location

      MD6 Phase I Location Map Rev 1

      Community Meeting

      MD6 Virtual Community Meeting Postcard

      • Click here to view the Virtual Community Meeting Notification

      When: Monday, March 28, 2022
      Time: 6:00 PM
      Link: https://youtu.be/PHgiivEwVNQ

      • Click here to view the Responses to Questions/Comments Received During Virtual Community Meeting on 3/28/2022

      Construction Photos

       Bonita 4

      Contact Information

      • Public Works Engineering, (818) 548-3945
      • Public Works Project Manager: Armen Avazian, Email