Central Park Paseo/Parking Lot No. 10 Improvements:
- Installation of brick and concrete paving pattern walkways, composite wood decking, seating, decorative lighting and neon signs;
- Installation of 3 "Pink Trumpet" trees within the paseo and Tiny Tower Italian Cypress trees within the concrete planter;
- Installation of pedestrian corridor and "palm court";
- Installation of four (4) parking pay stations;
- Installation of landscaping improvements;
- Installation of 46 parking stalls (2 ADA accessible);
- Installation of four (4) speed humps;
- Removal of existing power poles;
- Installation of underground electrical conduits and vaults;
- Installation of new storm drain; and
- Relocation of sewer main line.
Colorado Street Lane Addition:
- Widening of street by 9.5 feet on the north side between Alley No. 58 and Brand Blvd.
- Surface Grinding/Removal of existing asphalt concrete pavement and overlay with Asphalt Rubberized Hot Mix pavement (ARHM) over Asphalt Concrete Pavement (Base Course) over crushed aggregate base;
- Reconstruction of concrete curb and gutters, driveway approaches and aprons, alley aprons, sidewalks and curb ramps;
- Relocation of water meters, fire hydrant, street lights, street light pull boxes, twin globe decorative poles, electrical conduits, pull boxes, street signs, bus shelters, curb and area drains;
- Relocation of catch basins;
- Removal of existing street trees and plant three new 24-inch box trees;
- Relocation of two (2) palm trees on Colorado Street;
- Replacement of existing traffic striping and other traffic markings; and modify traffic signals.
Anticipated Construction Schedule April 2014 to November 2014, barring adverse weather conditions.
Documents:
Construction Photos:
All Construction Notification to Residents
Meeting Photo