Scope of Work
- Surface planning the existing pavement, where necessary;
- Selective removal and replacement of deteriorated asphalt concrete pavement;
- The grading and preparation of the sub grade;
- Selective removal, repair and reconstruction of damaged curbs, gutters, sidewalks, driveways, cross gutters, and alley aprons, including disposal of asphalt and Portland cement concrete pavements;
- Remodeling of roof drains;
- Curb ramp modification and reconstruction to meet the ADA guidelines requirements;
- Disposal of all construction debris, including disposal of asphalt and Portland cement concrete pavements;
- Application of crack sealing materials together with all appurtenant work.
Construction Schedule
- This project is currently in advertisement. Construction is anticipated to begin April 2020.
Project Location
The project locations are as follows:
Please check back at the start of the project.
Construction Photos
Please check back at the start of the project.
Contact Information
Public Works Engineering, (818) 549-3945
Public Works Project Manager, Armond Simonian