Scope of Work

  • Surface planning the existing pavement, where necessary;
  • Selective removal and replacement of deteriorated asphalt concrete pavement;
  • The grading and preparation of the sub grade;
  • Selective removal, repair and reconstruction of damaged curbs, gutters, sidewalks, driveways, cross gutters, and alley aprons, including disposal of asphalt and Portland cement concrete pavements;
  • Remodeling of roof drains;
  • Curb ramp modification and reconstruction  to meet the ADA guidelines requirements;
  • Disposal of all construction debris, including disposal of asphalt and Portland cement concrete pavements;
  • Application of crack sealing materials together with all appurtenant work.

Construction Schedule 

  • This project is currently in advertisement. Construction is anticipated to begin April 2020.

Project Location 

The project locations are as follows: 

FY 19-20 Sidewalk Repiar Program

Crack Sealing Program

Please check back at the start of the project. 

 Construction Photos 

Please check back at the start of the project. 

Contact Information 

Public Works Engineering, (818) 549-3945

Public Works Project Manager, Armond Simonian