Scope of Work

The project scope of work generally includes the followings:

  • The FY 2016-17 ADA Curb Ramp Installation and Pavement Repair: selective removal and reconstruction of damaged curbs, gutters, sidewalks, driveways, cross gutters, and alley aprons,  horizontal saw-cutting of lifted sidewalk, curb ramp modification and reconstruction  to meet the ADA guidelines requirements; remodeling of roof drains; removal of existing trees and planting new 24-inch box trees; disposal of all construction debris, including  disposal of asphalt and Portland cement concrete pavements together.
  • Bus Stop Improvements on Verdugo Road, Chevy Chase Drive and Wilson Avenue at Broadway: removal and disposal of existing soils and grass to construct 4-inch PCC pavement/bus stops landing area to meet ADA guidelines requirements, construction of PCC curbs and gutter and retaining curbs of various heights and retaining walls up to 4 feet in height, relocation of existing sign poles and signs, painting the red curb markings with bus stenciling.
  • Removal and Replacement of Decking at Central Park Paseo: removal and replacement of the existing wooden decking planks with composite TimberTech or approved equal decking planks.
  • Sidewalk Construction on Lowell Avenue per Plan No. 1-3022: removal and disposal of existing soils and grass to construct the 4-inch PCC pavement and retaining curbs of various heights slope regrading and landscaping.
  • Monument Construction on Foothill Boulevard per Plan No. 1-3034: construction of quick-crete pre-cast custom  “Welcome to Glendale” monuments, construction of median curbs,  and installation of decorative rock and cobbles, construction of solar powered accent lighting, removal of conflicting striping and striping installation.
  • Miscellaneous Work at Various Locations: removal of concrete news rack bunker at 702 N. Brand Blvd, and reconstruction of culvert at 1274 Mariposa Street 

Project Map

Project Location Map Sheets 1 thru 4_FY16-17 ADA Repair & Misc Improvements_Page_1

Project Location Map Sheets 1 thru 4_FY16-17 ADA Repair & Misc Improvements_Page_2

Project Location Map Sheets 1 thru 4_FY16-17 ADA Repair & Misc Improvements_Page_3

Project Location Map Sheets 1 thru 4_FY16-17 ADA Repair & Misc Improvements_Page_4

Photos of Various Completed Locations

ADA16-17_5

ADA16-17_9

ADA16-17_8

Contact Information

Public Works Engineering: (818) 548-3945

Project Manager: Jasmina Zigic (email)