Scope of Work

The scope of work generally includes the following:

 

• Selective removal and reconstruction of damaged curbs, gutters, sidewalks,
driveways, cross gutters, and alley aprons, and horizontal saw-cutting of lifted sidewalk;
• Curb ramp modifications to meet current ADA requirements; and
• Removal of existing street trees and planting new 24-inch box trees.
 
The project is part of the City’s annual program of installing new curb ramps, and reconstructing the existing substandard curb ramps to meet the ADA guideline requirements, repairing the uplifted or broken sidewalks, damaged curbs, gutters, and driveways. The installation of new curb ramps, where there are none, will provide uninterrupted access for disabled persons within the project limits. Trees that have overgrown the parkway or are dying will be removed and replaced with 24-inch box trees selected by the City’s Urban Forester.

 

Project Location

This project is generally located between Brand Boulevard and Geneva Street, north of Glenoaks Boulevard and south of Stocker Street.

 

Construction Schedule

May 2018 - July 2018

 

Contact Information

Public Works Engineering: (818) 548-3945

Project Manager: Arthur Asaturyan Email