Scope of Work

  • Removal, reconstruction, and surface of deteriorated pavement
  • Placement of asphalt concrete pavement.
  • Placement of asphalt hot mix pavement (ARHM) over asphalt rubber aggregate membrane (ARAM).
  • Application of emulsion aggregate slurry (Slurry Seal Type II) or application of emulsion aggregate slurry.
  • Installation of bio-swales within existing parkway/sidewalk and within mid-block curb extensions
  • New curb ramps meeting current Federal ADA requirements.
  • Some areas that will have reconstruction of damaged curbs, gutters, sidewalks, driveways, and cross cutters.
  • Modification of traffic signals
  • Installation of rectangular rapid flashing beacons and wayfinding signs.
  • New striping and signing
  • Shared-lane bike way pavement markings
  • New street trees in parkway. 

Construction Schedule

  • August 2016-Spring 2017

Project Locations

  • Harvard Street between Brand Blvd and Isabel Street
  • Louise Street between Wilson Ave and Maple Street

Construction Notification/Community Meeting

Please check back at the start of the project. Downloadable PDF will be provided. 

Construction Photos 

bioswale illustration.jpg

Contact Information

  • Public Works Engineering, (818)548-3945
  • Project Manager, Sarkis Oganesyan, (818)548-3945, Email